CATS rooms and teaching space service fit out; including New FCU's, VRF system, upgrade/ replace existing mechanical Swich Board, New BMS integration, New ductwork and Air balancing.
Stage 1 computer labs and photonics vision labs AC systems upgrade. Decommission of existing chilled water units, supply and installation of new VRV system, high level interface with BMS and electrical works.
Design and Construct Computer labs and teaching spaces. New BMS set out, ductwork Outside air fans and MSSB upgrade.
AHU air balancing and commissioning
Complete fittest for Level 10 library office space, New PAC units for conference and meeting rooms, new outside air systems and upgrade of existing toilet exhaust systems.
UNSW Pioneer technology on 3D in Australia relies on MEP Building solutions their Full Mechanical services, and state of the art computer room (CRAC) facilities for high power computers to power six-metre-diameter “mega brain”. https://www.artdesign.unsw.edu.au/research/epicentre-expanded-perception-interaction-centre
Purposely built air conditioning and computer room units for Innovate HUMAN- Robotics technology relies on MEP Building solutions to maintain comfort temperature on their facilities
Copyright © 2017 MEP Technologies - MEP Building Solutions Pty Ltd,
MEP Building Services & Oranga Pty Ltd. All Rights Reserved.
ABN 27 609 005 245