University of NSW

UNSW CATS Upgrade Goldstein Hall

image24

CATS rooms and teaching space service fit out; including New FCU's, VRF system, upgrade/ replace existing mechanical Swich Board, New BMS integration, New ductwork and Air balancing.

Keith Burrows and Physics Theatres

image25

Stage 1 computer labs and photonics vision labs AC systems upgrade. Decommission of existing chilled water units, supply and installation of new VRV system, high level interface with BMS and electrical works.

UNSW – K17 Cyber Security Lab and Teaching Lab

image26

Design and Construct Computer labs and teaching spaces. New BMS set out, ductwork Outside air fans and MSSB upgrade.

AHU air balancing and commissioning

Library fit out Level 10

image27

Complete  fittest for Level 10 library office space, New PAC units for conference and meeting rooms, new outside air systems and upgrade of existing toilet exhaust systems.

EPIC Faculty of Arts & Design block C Paddington Campus

image28

UNSW Pioneer technology on 3D in Australia relies on MEP Building solutions their Full  Mechanical services, and state of the art computer room (CRAC) facilities for high power computers to power six-metre-diameter “mega brain”. https://www.artdesign.unsw.edu.au/research/epicentre-expanded-perception-interaction-centre

Human Robotics

image29

  Purposely built air conditioning and computer room units for Innovate HUMAN- Robotics technology relies on MEP Building solutions to maintain comfort temperature on their facilities